Protocol for the Decontamination and Calibration of Estuary Sensors:
Before initiating the field deployment, the operator must execute the following sequence:
First, rinse the sensor housing with deionized water to remove residual saline crusts. Immediately following this rinse, calibrate the salinity sensor using a certified 35 ppt standard solution. Once calibration is complete, the operator must dry the external casing with a lint-free wipe. Prior to submerging the sensor array into the estuary flow, it is mandatory to log the calibration parameters in the database. Finally, verify that the protective copper mesh is secured to prevent biofouling.
Based on the provided sensor maintenance protocol, which action should the technician complete immediately after calibrating the salinity sensor and prior to logging the calibration parameters in the database?
- ALog the calibration parameters in the database.
- Dry the external casing of the sensor array with a lint-free wipe.Answer
- CRinse the sensor housing with deionized water to remove residual saline crusts.
- DSubmerge the sensor array in the estuary flow.