You are listening to an instructional audio broadcast from an agricultural research center detailing the operational maintenance protocol for a closed-loop hydroponic reservoir. The lead agronomist delivers the following sequence of spoken directives:
"First, flush the primary filter with distilled water and do not open the main valve until the pressure gauge stabilizes. Next, measure the mineral concentration and immediately add the organic buffer solution. Following that, stir the mixture continuously for five minutes. Finally, seal the aeration port and record the stabilized pH levels in the operational logbook."
Based on the spoken instructions, what is the correct chronological order of the technician's required procedures from first to last?
- 1Flush the primary filter with distilled water and confirm pressure stabilization before opening the main valve.
- 2Measure the mineral concentration and introduce the organic buffer solution.
- 3Agitate the blended reservoir mixture continuously for five minutes.
- 4Secure the aeration port and record the final stabilized pH measurements in the logbook.