Question

Difficulty: MediumSequential Detail Extraction

Read the following passage:

During geotechnical soil exploration, drilling crews follow a strict sequential protocol to document and preserve core samples recovered from drilling augers. Upon extracting the split-spoon sampler from the borehole, the lead technician immediately cleans exterior drilling mud from the split tube before opening the casing. Once the casing is split open, the field geologist measures and logs total core recovery length prior to applying moisture-retaining wax sealants. After recording the length measurement, the core segments are coated in microcrystalline wax to prevent desiccation. Finally, before loading the preserved cores into transport crates, technicians affix barcoded depth identification tags to each tube.

Based on the passage, match each procedural action with its corresponding sequential timing.

  • Cleaning exterior drilling mud from the split tubePerformed immediately after extracting the sampler, prior to opening the casing
  • Measuring and logging total core recovery lengthExecuted once the casing is split open, before applying wax sealants
  • Coating core segments in microcrystalline waxCompleted after logging the length measurement, to prevent desiccation
  • Affixing barcoded depth identification tagsCarried out as the final step before loading preserved cores into crates

Answer

Cleaning exterior mud matches performing immediately upon extraction before opening the casing; measuring core recovery length matches executing once the casing is opened before applying wax; coating segments in wax matches completing after recording length measurement; affixing identification tags matches carrying out as the final step before crate loading.
Each step in the technical protocol is anchored by precise sequential signal phrases. Cleaning the tube occurs before opening the casing; logging length occurs before waxing; wax coating occurs after length measurement; and affixing identification tags is the terminal step before loading into crates.

Step-by-Step Solution

1
Locate the chronological transitions in the passage
Identified explicit markers: 'Upon extracting... before opening', 'Once... prior to', 'After recording', and 'Finally, before loading'.
Chronological signal words establish the exact order of procedural events.
2
Pair each action to its governing sequential marker
Mud cleaning precedes casing opening; core measurement precedes waxing; waxing follows measurement; tag affixing precedes crate loading.
Direct textual cues link each specific task to its relative timeframe in the protocol.
3
Verify pairings against passage details to avoid sequence inversions
All four actions correspond directly to their respective timing descriptions.
Ensures no adjacent steps or trigger conditions have been transposed.

Key Concept

Extracting chronological and procedural relationships using explicit transitional signal phrases
Estimated Time:1m 0s