A plumber is preparing to join cross-linked polyethylene (PEX) water supply tubing using standard brass insert fittings and copper crimp rings. What is the correct sequence of steps to create a secure, leak-free crimped connection?
- 1Cut the PEX tubing squarely to length using a dedicated tubing cutter.
- 2Slide the copper crimp ring over the end of the tubing.
- 3Insert the barbed fitting into the tubing until the pipe reaches the fitting shoulder.
- 4Position the ring approximately 1/8 to 1/4 inch from the tube end and compress it with a crimping tool.
Answer
Cut the tubing squarely, slide the crimp ring onto the tube, insert the barbed fitting until fully seated, and position the ring over the barbs to compress it with a crimping tool.
The correct procedural order requires cutting the tubing cleanly first, sliding the crimp ring onto the pipe before it expands, seating the barbed fitting fully against its shoulder, and finally positioning and compressing the ring over the barb area.
Step-by-Step Solution
Key Concept
PEX Crimp Connection Procedure
Estimated Time:1m 0s