A military engineering battalion is scheduled to pave a new airstrip requiring a total of tons of asphalt. During the first week of operations, the battalion completes of the total project. During the second week, bad weather slows progress, and they complete only of the remaining project. The asphalt needed to finish the rest of the airstrip will be delivered in dump trucks. If each dump truck has a capacity of tons and must be fully loaded, how many dump trucks are required to deliver the exact remaining amount of asphalt?
- A48
- B64
- 16Answer
- D96
Answer
16
The correct answer is found by tracking the remaining asphalt after each week. After week one, of the tons remain, which is tons. In week two, of that tons is used, leaving of , which equals tons. Finally, dividing the remaining tons by the truck capacity of (or ) tons yields exactly trucks.
Step-by-Step Solution
Key Concept
Multiplying fractions to find a part of a remainder, and dividing a whole number by a mixed number.