A mechanic is securing a heavy steel mounting bracket to a vehicle frame rail using a standard vibration-resistant through-bolt fastener assembly. Arrange the components in the correct physical sequence along the fastener axis, starting at the bolt head insertion side and proceeding to the threaded end. In what sequence must these components be assembled from the bolt head to the securing nut?
- 1Hex head cap bolt
- 2Plain flat washer (head side)
- 3Mating structural steel plates (bracket and frame rail)
- 4Helical split-ring lock washer (nut side)
- 5Finished hex nut
Answer
Hex head cap bolt → Plain flat washer (head side) → Mating structural steel plates (bracket and frame rail) → Helical split-ring lock washer (nut side) → Finished hex nut
In a standard through-bolted mechanical assembly, the load path begins at the bolt head, passes through a flat washer that distributes clamping pressure, penetrates the joined workpieces, engages a split-ring helical lock washer on the nut side to maintain continuous spring preload against vibration, and terminates at the hex nut which applies the tightening torque.
Step-by-Step Solution
Key Concept
Proper mechanical through-bolt joint stackup and washer positioning
Estimated Time:1m 15s