Read the following technical passage:
Before operating portable reverse osmosis water purification units (ROWPU) in sub-freezing environments, technicians must activate the internal manifold heating jacket. If ambient temperatures fall below 25 degrees Fahrenheit, the chemical injection metering pump requires pre-heating for 15 minutes to prevent hypochlorite crystallization. Additionally, operators must ensure the high-pressure concentrate discharge valve is positioned open by three full rotations to avoid membrane burst during initial startup.
Based on the passage, complete the statement with the exact number or word specified in the text.
Answer:To prevent a membrane burst during initial startup, operators must ensure the high-pressure concentrate discharge valve is positioned open by 【three】 full rotations.
Answer
three (or 3)
The passage explicitly states that operators must ensure the high-pressure concentrate discharge valve is open by three full rotations to avoid a membrane burst during startup.
Step-by-Step Solution
Key Concept
Direct factual detail extraction from technical instructional text
Estimated Time:45s