The BAK-12 aircraft arresting system is installed along military runways to safely decelerate tactical aircraft during emergency landings. The system utilizes two synchronized energy absorbers positioned on opposite sides of the runway, connected by a steel purchase tape to a pendant cable. When an aircraft's tailhook engages the pendant, the purchase tape unspools against a modulated hydraulic braking force. To prevent tape binding, technicians must inspect the hydraulic brake pressure relief valves every 30 days and replace the sacrificial bronze friction pucks whenever wear exceeds a thickness threshold of 0.125 inches.
According to the passage, what specific maintenance action must be performed every 30 days?
- AReplace the sacrificial bronze friction pucks
- Inspect the hydraulic brake pressure relief valvesAnswer
- CCalibrate the purchase tape unspooling tension to 0.125 inches
- DFlush the hydraulic fluid in both synchronized energy absorbers
Answer
Technicians must inspect the hydraulic brake pressure relief valves every 30 days.
The author explicitly states that technicians must inspect the hydraulic brake pressure relief valves every 30 days to prevent tape binding.
Step-by-Step Solution
Key Concept
Direct Fact Retrieval
Estimated Time:1m 0s