During field repairs of carbon-fiber aircraft panels, technicians follow a strict thermal curing sequence. First, the damaged area is sanded down to bare composite and wiped clean with solvent. Next, a pre-impregnated resin patch is applied over the repair zone. Prior to activating the heating blanket, technicians must install a vacuum debulking bag over the patch to eliminate trapped air pockets. Once the vacuum seal achieves the required pressure, the heating cycle is initiated to cure the resin. Finally, after the assembly cools to ambient temperature, the vacuum bag is removed for ultrasonic inspection.
According to the passage, which action is performed immediately prior to activating the heating blanket?
- AWiping the sanded surface clean with solvent
- Installing a vacuum debulking bag over the patchAnswer
- CRemoving the vacuum bag for ultrasonic inspection
- DAllowing the composite assembly to cool to ambient temperature
Answer
Installing a vacuum debulking bag over the patch
The passage clearly establishes the order of operations by stating that prior to activating the heating blanket, technicians must install a vacuum debulking bag over the patch to remove air pockets.
Step-by-Step Solution
Key Concept
Sequential Detail Extraction
Estimated Time:1m 0s