During magnetic particle inspection of forged marine propulsion shafts, technicians apply fluorescent ferromagnetic particles suspended in a petroleum distillate carrier. The inspection protocol dictates that the circular magnetizing current must reach a continuous density of 800 amperes per inch of shaft diameter. Before applying the wet bath, the surface must be degreased using an isopropyl solvent and dried for a minimum of twelve minutes. If subsurface linear indications exceed 1.5 millimeters in length, the shaft requires demagnetization down to less than 3 gauss before undergoing secondary ultrasonic verification.
According to the passage, which specific preparatory action must be performed prior to applying the wet fluorescent particle suspension to the shaft?
- ADemagnetizing the shaft assembly to a field strength of less than 3 gauss
- BApplying a continuous magnetizing current of 800 amperes for exactly twelve minutes
- Degreasing the shaft surface with an isopropyl solvent and allowing it to dry for at least twelve minutesAnswer
- DConducting secondary ultrasonic verification to detect subsurface indications over 1.5 millimeters