A maintenance crew is scheduled to overhaul a radar system. The procedure consists of three sequential phases: diagnostics taking hour and minutes, component replacement taking hours and minutes, and recalibration taking minutes. If the crew begins the overhaul at hours, at what time will the entire procedure be completed?
- Ahours
- Bhours
- hoursAnswer
- Dhours
Answer
The entire procedure will be completed at hours.
The total duration of the three phases is 310 minutes, which converts to exactly 5 hours and 10 minutes. When you add this elapsed time to the starting clock time of 0920 hours, the final completion time correctly evaluates to 1430 hours.
Step-by-Step Solution
Key Concept
Calculating total elapsed time by converting between minutes and hours (using a base-60 system) and applying it to a 24-hour military clock.
Alternative Method
Instead of converting to minutes, you can group the hours and minutes separately: Add the whole hours (1 hour + 2 hours = 3 hours). Then add the minutes (45 + 30 + 55 = 130 minutes). Convert the 130 minutes to 2 hours and 10 minutes, and combine this with the 3 hours to get a total duration of 5 hours and 10 minutes.
Estimated Time:1m 30s