An enterprise organization is updating its disaster recovery strategy for an internal human resources application. The Business Impact Analysis (BIA) specifies a Recovery Time Objective (RTO) of 6 hours and a Recovery Point Objective (RPO) of 24 hours. To meet budget constraints, management wants to avoid paying for continuously running duplicate hardware and real-time data replication, but requires pre-routed networking and pre-installed server hardware so that daily backups can be loaded quickly following a disaster. Which of the following recovery site strategies best fulfills these requirements?
- ACold site
- Warm siteAnswer
- CHot site
- DActive-Active site
Answer
A warm site provides the optimal balance of pre-installed hardware infrastructure and cost savings, allowing system restoration from 24-hour backups within the 6-hour RTO window.
The correct strategy is a warm site. A warm site includes physical space, power, cooling, network connectivity, and pre-installed server hardware. Because data is not synchronized continuously in real time, administrators must restore recent daily backups (matching the 24-hour RPO) onto the hardware during a failover event, which can comfortably be completed within the 6-hour RTO without the high ongoing cost of active hot site replication.
Step-by-Step Solution
Key Concept
Disaster recovery site types and RTO/RPO trade-offs