Match each Business Impact Analysis (BIA) and business continuity metric on the left with its corresponding operational definition in an enterprise airport operations management system on the right.
- Recovery Point Objective (RPO)The maximum acceptable age of unrecovered transactional data, determining mandatory data backup frequency.
- Recovery Time Objective (RTO)The target duration of time allowed to restore system hardware, software, and network services back online.
- Maximum Tolerable Downtime (MTD)The total maximum outage time a critical business process can endure before causing irreversible organizational damage.
- Work Recovery Time (WRT)The time frame required following technical system restoration to perform integrity checks, testing, and operational reconciliation.
Answer
Recovery Point Objective pairs with acceptable data loss age; Recovery Time Objective pairs with technical system restoration deadline; Maximum Tolerable Downtime pairs with overall outage limit; Work Recovery Time pairs with post-technical restoration operational verification.
Each business continuity metric measures a distinct parameter of operational recovery. RPO measures data loss tolerance (data age). RTO specifies the technical infrastructure restoration target. MTD represents the overall maximum disruption window, and WRT measures post-restoration validation and operational setup before full business resume.
Step-by-Step Solution
Key Concept
Business Continuity Metrics and Impact Thresholds