An enterprise risk management team is conducting a Business Impact Analysis (BIA) to update the business continuity plan for a core online payment platform. During the assessment, the team reviews operational recovery metrics and system availability controls. Which of the following statements correctly align BIA metrics and continuity parameters with their operational objectives? (Select TWO.)
- Establishing a Recovery Point Objective (RPO) of 15 minutes specifies the maximum allowable duration of transaction data loss during an unexpected outage.Answer
- Defining a Recovery Time Objective (RTO) of 2 hours sets the targeted timeframe within which the application and underlying infrastructure must be restored to service.Answer
- CSetting a Maximum Tolerable Downtime (MTD) value lower than the Recovery Time Objective (RTO) guarantees that systems recover before catastrophic financial loss occurs.
- DDeploying an active-active geographically redundant hot site functions primarily as a detective control to notify analysts of primary data center failure.
Answer
The two correct statements are: establishing an RPO of 15 minutes specifies the maximum allowable data loss duration, and defining an RTO of 2 hours sets the targeted timeframe within which the application must be restored.
The statement specifying RPO as the allowable duration of transaction data loss correctly describes the metric's purpose of quantifying data currency loss boundaries. The statement defining RTO as the targeted timeframe for service restoration correctly identifies the system downtime operational objective.
Step-by-Step Solution
Key Concept
Business Impact Analysis and Business Continuity Metrics (RTO, RPO, MTD)