To combat the depletion of its primary freshwater aquifer, a coastal agricultural district plans to install solar-powered desalination micro-turbines along drainage channels. These turbines will convert brackish surface runoff into water suitable for crop irrigation. District officials project that because the converted water will meet 35 percent of the district's current annual irrigation volume, agricultural pumpage from the aquifer will decrease significantly over the next five years.
Which of the following, if true, most seriously weakens the district officials' projection?
- Farmers in the district plan to use the converted runoff to cultivate high-yield crop varieties that require routine soil flushing with pure freshwater from the aquifer to prevent salt buildup.Answer
- BThe solar-powered turbines operate at maximum output during peak summer months when crop water demand and aquifer drawdown are highest.
- CThe initial capital cost of purchasing and installing the micro-turbines will not be fully recouped by farmers within the five-year projection period.
- DDesalination facilities operating in adjacent inland agricultural districts rely on electrical grid power rather than solar energy.
- EOrganic sediments present in brackish surface runoff slightly decrease the operational lifespan of the micro-turbine filtration membranes.
Answer
The argument is most seriously weakened by the finding that using converted brackish runoff requires farmers to routinely flush soil with pure freshwater drawn from the aquifer. This unstated operational side effect directly undermines the expected net reduction in aquifer pumpage.
The correct answer identifies an unintended operational consequence: using desalinated brackish water increases salt accumulation in soil, which in turn requires farmers to pump pure freshwater from the aquifer to flush the crops. This extra freshwater demand counteracts the projected 35 percent savings, severely undermining the claim that total aquifer pumpage will decrease.
Step-by-Step Solution
Key Concept
Evaluating Plan Feasibility and Counterproductive Side Effects
Estimated Time:2m 0s