A large-scale commercial footwear manufacturing factory in Aba operates a highly specialized assembly line utilizing division of labour. Arrange the following operational tasks in the correct chronological order from raw material intake to final product release for warehousing.
- 1Sorting, grading, and chemical conditioning of raw animal hides in the material preparation department
- 2Pattern cutting and upper leather clicking performed by specialized cutting operatives
- 3Lasting, stitching, and sole vulcanization at dedicated assembly-line workstations
- 4Edge trimming, surface buffing, and final quality assurance inspection by finishing specialists
- 5Individual boxing, container cartoning, and batch labeling by packaging and logistics personnel
Answer
The correct chronological sequence of operations in the division of labour workflow is: 1) Sorting, grading, and chemical conditioning of raw hides; 2) Pattern cutting and upper leather clicking; 3) Lasting, stitching, and sole vulcanization; 4) Edge trimming, buffing, and quality inspection; 5) Boxing, cartoning, and batch labeling.
In an industrial production line governed by division of labour, tasks follow a strict technical sequence: raw material preparation comes first, followed by specialized component cutting, major structural assembly, cosmetic finishing with quality control, and finally protective commercial packaging.
Step-by-Step Solution
Key Concept
Sequential Division of Labour in Industrial Manufacturing
Estimated Time:2m 30s