The regional groundwater protection board established the following regulatory criteria for industrial operations:
• Every industrial facility operating within the Karst Protection Overlay District that discharges effluent into the primary watershed is required to maintain a tertiary closed-loop filtration system.
• Any industrial facility that maintains a tertiary closed-loop filtration system is exempt from quarterly bioassay soil monitoring.
• No industrial facility subject to mandatory annual hydrologic reporting is exempt from quarterly bioassay soil monitoring.
• Some manufacturing plants operating within the Karst Protection Overlay District are subject to mandatory annual hydrologic reporting.
If all of the statements above are true, which of the following statements must also be true? (Select all that apply.)
- At least some manufacturing plants operating within the Karst Protection Overlay District do not discharge effluent into the primary watershed.Answer
- BEvery industrial facility operating within the Karst Protection Overlay District that is exempt from quarterly bioassay soil monitoring discharges effluent into the primary watershed.
- CAll industrial facilities that do not discharge effluent into the primary watershed are subject to mandatory annual hydrologic reporting.
- No industrial facility subject to mandatory annual hydrologic reporting maintains a tertiary closed-loop filtration system.Answer
- EAny manufacturing plant operating within the Karst Protection Overlay District that does not maintain a tertiary closed-loop filtration system violates board regulations.