Question

Difficulty: Very hardErgonomics and Safe Use of Equipment

An LPN receives orders to mobilize an immobile bariatric client to a specialized cardiac chair for the first time post-admission. The facility protocol mandates the use of a ceiling-mounted mechanical lift with a full-body sling. Place the following steps in the correct chronological order to ensure both nurse ergonomics and client safety during this procedure. All steps must be used.

  1. 1Inspect the full-body sling for fabric integrity and confirm the ceiling lift's maximum weight capacity exceeds the client's documented weight.
  2. 2Engage the bed's locking mechanism and elevate the mattress to an appropriate ergonomic working level for the nurse.
  3. 3Roll the client gently to one side to tuck the sling underneath, smoothing out any creases in the material.
  4. 4Lower the overhead spreader bar and attach the sling's loops, ensuring proper alignment of the lower extremity supports.
  5. 5Hoist the client just high enough to clear the mattress surface and conduct a visual inspection of all attachment points.
  6. 6Guide the suspended lift assembly along the ceiling track toward the locked chair and gradually lower the client into a seated position.

Answer

The correct sequence prioritizes pre-procedure equipment safety verification, ergonomic environmental preparation, proper sling placement, secure attachment, an initial safety suspension check, and finally the transfer execution.
The correct chronological sequence ensures both patient safety and nurse ergonomics. Verifying equipment safety parameters must always precede patient contact. Next, the environment is secured and optimized ergonomically by adjusting the bed height. Patient positioning comes third, ensuring skin integrity. Fourth, the equipment is attached. Fifth, a critical test lift is performed slightly above the bed to confirm structural integrity before the final step of executing the full transfer to the chair.

Step-by-Step Solution

1
Inspect the sling and verify the lift's weight capacity.
Equipment is confirmed safe for this specific bariatric client.
Using faulty equipment or exceeding weight limits can cause severe injury.
2
Lock the bed and adjust it to an ergonomic height.
The bed is stable and at a safe working level.
Proper bed height prevents back strain for the nurse during patient repositioning.
3
Turn the client and position the sling smoothly.
The sling is securely placed without wrinkles.
Wrinkles under a heavy client can cause shearing forces and pressure injuries.
4
Connect the sling loops to the overhead spreader bar.
The client is physically connected to the lifting device.
Proper attachment ensures the client will not slip out during the lift.
5
Lift the client slightly off the mattress to check attachments.
Tension is applied to verify secure connections.
An initial test lift ensures safety before the client is fully suspended away from the safety of the bed surface.
6
Guide the lift to the chair and lower the client.
The client is successfully and safely transferred.
Moving the client only after all safety checks prevents catastrophic falls.

Key Concept

Ergonomics and Safe Use of Equipment
Rate this question