Question

Difficulty: MediumBasic Care and Comfort

Prior to an endoscopic procedure, a client requires the administration of a large-volume cleansing enema. The supplies are at the bedside, and the client's identity has been verified. In what sequence should the nurse perform the administration steps? Arrange the actions from first to last.

  1. 1Assist the client into the left lateral Sims position with the right knee flexed.
  2. 2Place a waterproof pad under the client's buttocks and put on clean examination gloves.
  3. 3Lubricate the distal 5 to 7.5 cm (2 to 3 inches) of the enema tubing tip.
  4. 4Gently insert the tube 7.5 to 10 cm (3 to 4 inches) into the anal canal, directing it toward the umbilicus.
  5. 5Release the tubing clamp and elevate the solution container 30 to 45 cm (12 to 18 inches) above the client's anus.

Answer

The correct sequence is to first position the client in the left lateral Sims position, then place a protective pad and don gloves, lubricate the tip of the enema tubing, safely insert the tube into the rectum, and finally release the clamp while elevating the container to the correct height.
Safe enema administration requires following a logical sequence that prioritizes anatomical alignment, infection control, and trauma prevention. Positioning the client properly on the left side ensures gravity assists the fluid. Once positioned, the nurse ensures hygiene and lubricates the tubing to protect the mucosa. After safely inserting the tube following the bowel's anatomical curve, the nurse initiates the fluid flow at a controlled height to prevent sudden cramping and maximize retention.

Step-by-Step Solution

1
Assist the client into the left lateral Sims position.
The client's descending and sigmoid colon are optimally oriented for gravity-assisted fluid flow.
This anatomical positioning prevents fluid from immediately returning to the rectum and being prematurely expelled.
2
Place a waterproof pad under the buttocks and put on clean examination gloves.
The immediate environment is protected, and standard infection control precautions are implemented.
Maintaining hygiene and protecting linens is essential before initiating the invasive portion of the procedure.
3
Lubricate the distal 5 to 7.5 cm (2 to 3 inches) of the enema tubing tip.
The insertion tip is prepared for smooth entry into the anal sphincter.
A lubricated tip prevents mucosal tearing, pain, and vagal nerve stimulation during insertion.
4
Gently insert the tube 7.5 to 10 cm (3 to 4 inches) into the anal canal, directing it toward the umbilicus.
The tube rests safely in the rectum without penetrating too deeply.
Directing toward the umbilicus aligns with the natural curvature of the rectum, preventing bowel wall injury.
5
Release the tubing clamp and elevate the solution container 30 to 45 cm (12 to 18 inches) above the client's anus.
The enema solution flows steadily into the lower gastrointestinal tract at a safe pressure.
Proper height management prevents rapid fluid instillation, which can cause severe cramping, fluid expulsion, or tissue damage.

Key Concept

Procedural safety and client positioning for large-volume enema administration
Rate this question