Read the following passage carefully:
Under the 2026 State Public Transport Electrification and Grid Balancing Directive, municipal bus corporations operating fleet sizes exceeding 200 electric vehicles (EVs) are mandated to integrate Vehicle-to-Grid (V2G) bidirectional charging infrastructure across all central depots. To qualify for state-subsidized battery replacement grants, these transit corporations must demonstrate that at least 30% of their total fleet battery storage capacity is made available to the regional load dispatch center for grid stabilization during evening peak demand hours. However, the directive explicitly mandates that V2G discharge protocols must automatically disengage whenever a vehicle's battery state-of-charge drops to 40%, ensuring that regular public transit operations remain uncompromised. Furthermore, municipalities that fail to meet the 30% grid-support capacity commitment for two consecutive quarters forfeit their eligibility for dynamic power tariff discounts, although their access to standard fleet electrification capital grants remains entirely unaffected. Consequently, smaller municipal bodies operating fewer than 200 electric vehicles are exempted from mandatory V2G integration, though they may voluntarily opt in under a separate municipal incentive framework.
Based strictly on the passage above, which of the following statements can be logically inferred regarding the 2026 State Public Transport Electrification and Grid Balancing Directive?
- A municipal transit corporation operating 250 electric vehicles will not lose its entitlement to standard fleet electrification capital grants solely due to failing the peak-demand capacity commitment.Answer
- BMunicipal bus corporations operating fewer than 200 electric vehicles are strictly prohibited from connecting their vehicles to Vehicle-to-Grid infrastructure.
- CMaintaining a battery state-of-charge above 40% during V2G discharge automatically guarantees that a transit corporation receives battery replacement grants.
- DRegional load dispatch centers prefer public transport V2G discharge over traditional power plants because urban grids experience severe summer blackouts during peak hours.