An internal medicine residency program is preparing to introduce a novel electronic sign-out tool to facilitate transitions of care between day and night teams. To ensure patient safety during this transition, a multidisciplinary committee is formed to evaluate the new sign-out workflow before it goes live. The team creates a detailed process map of the planned workflow and brainstorms potential ways communication could break down at each step. For each potential breakdown, the team assigns numerical scores for the anticipated severity of patient harm, the likelihood of the breakdown occurring, and the probability that the error would go undetected. These scores are multiplied together to prioritize which steps require additional safeguards. Which of the following quality improvement methodologies is the committee utilizing?
- Failure Mode and Effects AnalysisAnswer
- BRoot Cause Analysis
- CPlan-Do-Study-Act cycle
- DIshikawa diagramming
- ECognitive debiasing strategy