A 28-year-old primigravida at 39 weeks gestation is admitted to the labor and delivery unit in active labor. She requests epidural analgesia. During preparation, a nurse nearly connects the epidural bupivacaine infusion into the patient's peripheral intravenous line due to similar-appearing tubing ports. The error is recognized and intercepted just before administration. In response to this near miss, the department director convenes a multidisciplinary quality and safety team. Rather than solely investigating this specific event, the team is tasked with mapping out the entire process of neuraxial medication administration on the unit. They brainstorm all potential ways the tubing, labeling, and administration steps could fail. The team then assigns numerical scores to each potential failure based on its severity, likelihood of occurrence, and probability of going undetected. The combined scores are used to prioritize the rollout of new, physically incompatible tubing connectors. Which of the following quality improvement methodologies is the team employing?
- Failure mode and effects analysisAnswer
- BRoot cause analysis
- CPlan-Do-Study-Act cycle
- DLean methodology
- EPareto analysis