In an environmental sustainability broadcast, a workshop facilitator provides oral instructions for assembling a community biosand water filtration column:
"To construct the filtration column, you will eventually install the biological diffuser plate across the top rim once the fine silica sand layer is fully leveled. Before introducing any silica sand, however, ensure you insert the perforated collection tube into the drainage outlet, which must be done immediately after placing the coarse gravel base at the container's bottom. Finally, upon securing the diffuser plate in position, fill the reservoir with raw water to initiate bio-layer cultivation."
Based on the transitional markers and instructions in the broadcast, in which chronological order should these assembly steps be performed from earliest to latest?
- 1Place the coarse gravel base at the bottom of the container
- 2Insert the perforated collection tube into the drainage outlet
- 3Install the biological diffuser plate across the top rim
- 4Fill the reservoir with raw water to begin bio-layer cultivation