An environmental scientist measures the daily water flow (in gallons per minute) from a natural spring over five days. The recorded values are , , , , and . If the scientist needs the average (mean) flow rate across a full six-day period to be exactly gallons per minute, what must the flow rate be on the sixth day?
- A
- B
- Cevap
- D
Cevap
To find the missing value for the sixth day, first determine the total sum required for all six days. Since the target mean is , the required total sum is . Next, find the sum of the five days already recorded: . The required flow rate for the sixth day is the difference between these two sums: .
Adım Adım Çözüm
Anahtar Kavram
Calculating a missing data point in a set when the target arithmetic mean is provided.