A combat engineer is preparing a concrete mixture for a runway repair. The project requires a total of cubic feet of sand. The engineer has two available piles of sand: one containing cubic feet and another containing cubic feet. If both piles are combined, how many more cubic feet of sand are needed to meet the total requirement?
- A
- B
- Cevap
- D
Cevap
The correct amount of additional sand needed is cubic feet.
The correct calculation requires first summing the available resources () and then subtracting this from the target amount (). Converting to a common denominator of and regrouping the whole number correctly yields exactly .
Adım Adım Çözüm
Anahtar Kavram
Adding and subtracting mixed numbers with unlike denominators, including regrouping (borrowing).