A network technician is troubleshooting a desktop computer that dropped off the corporate network. The technician gathered details from the user, inspected the system, and established a theory that a damaged Ethernet patch cable caused the loss of connectivity. The technician then replaced the cable with a known-good patch cable, which immediately restored physical link connectivity and IP communication. Which action should the technician perform NEXT according to the standard CompTIA troubleshooting methodology?
- Verify complete system functionality and, if appropriate, implement preventive measures to safeguard the new cable.Cevap
- BImmediately log the ticket resolution, findings, and completed actions in the IT help desk documentation system.
- CReconfigure the network router to re-assign an IP address subnet to the desktop.
- DUpdate the host name resolution records on the DNS server to refresh the workstation connection.
Cevap
Verify complete system functionality and, if appropriate, implement preventive measures to safeguard the new cable.
According to the CompTIA troubleshooting methodology, after establishing a theory, testing it, and implementing the solution (replacing the patch cable), the technician must verify full system functionality and implement preventive measures (Step 5).
Adım Adım Çözüm
Anahtar Kavram
CompTIA 6-Step Troubleshooting Methodology Sequence