A system administrator resolves an issue where workstations in a remote branch office were failing to obtain authentications from a newly migrated domain controller due to misconfigured subnets in Active Directory Sites and Services. After correcting the site bindings and verifying connectivity, the administrator must complete the ticket lifecycle. Which of the following documentation actions are required before closing the support ticket? (Select TWO.)
- Log the specific root cause, network configuration changes made, and verification test results in the ticket's internal resolution notes.Cevap
- Update the Configuration Management Database (CMDB) to associate the updated domain controller subnet mappings with the remote branch site asset records.Cevap
- CEdit the initial user-submitted ticket description to replace the original symptom report with the final technical diagnosis.
- DClose the ticket immediately upon confirming network ping response without contacting the end user or site contact for verification.
Cevap
Proper ticketing workflow requires logging the complete technical resolution notes (including root cause and verification steps) and updating infrastructure dependencies in the CMDB before obtaining user sign-off and closing the ticket.
Correct ticket workflow standards dictate that technicians log comprehensive resolution entries (including the root cause, steps taken, and confirmation testing) and update associated asset management database (CMDB) records to reflect configuration updates.
Adım Adım Çözüm
Anahtar Kavram
Complete Incident Documentation and Ticket Resolution Workflows