An enterprise network administrator configures a backup schedule where a full backup is executed every Sunday at 01:00 AM, and differential backups are executed daily at 11:00 PM from Monday through Saturday. On Thursday at 03:00 PM, a primary storage array suffers an unrecoverable disk crash. Which of the following represents the minimum sequence of restoration jobs required to recover the system to its latest available backup state?
- Restore the Sunday full backup, followed by the Wednesday differential backup.Cevap
- BRestore the Sunday full backup, followed sequentially by the Monday, Tuesday, and Wednesday differential backups.
- CRestore the Sunday full backup, followed by the Thursday differential backup.
- DRestore only the Wednesday differential backup directly to the storage volume.
Cevap
Restore the Sunday full backup, followed by the Wednesday differential backup.
Differential backups accumulate all changes made since the last full baseline backup. Consequently, recovering a system configured with a full baseline and differential backups requires restoring the full backup first, followed strictly by the single most recent differential backup set (Wednesday at 11:00 PM).
Adım Adım Çözüm
Anahtar Kavram
Differential Backup Restoration Mechanics
Tahmini Süre:1m 30s