An enterprise network operations team is establishing key performance indicators (KPIs) for a mission-critical payment gateway system. The Business Impact Analysis (BIA) specifies that data loss during a unexpected outage must not exceed 30 minutes of transaction history, and full operational capability of the network infrastructure must be restored within 2 hours of a disruption. Which TWO of the following configuration goals or metrics directly align with these specified business requirements? (Select TWO.)
- Establishing a Recovery Point Objective (RPO) target of 30 minutes or lessCevap
- Establishing a Recovery Time Objective (RTO) target of 2 hours or lessCevap
- CSetting a Mean Time Between Failures (MTBF) threshold of 2 hours
- DProvisioning a cold disaster recovery site to meet the 2-hour operational restoration target
- EExecuting daily differential backups every 24 hours as the sole data protection policy
Cevap
The correct strategies are establishing a Recovery Point Objective (RPO) target of 30 minutes or less and establishing a Recovery Time Objective (RTO) target of 2 hours or less.
Establishing an RPO of 30 minutes directly satisfies the constraint that data loss must not exceed 30 minutes of transaction history. Establishing an RTO of 2 hours directly satisfies the requirement that network capability must be restored within a 2-hour timeframe.
Adım Adım Çözüm
Anahtar Kavram
Business Continuity Planning Metrics (RPO vs RTO)