A network administrator has just completed testing a theory and confirmed that an incorrect Maximum Transmission Unit (MTU) setting on an edge router interface is causing packet fragmentation and dropping encrypted site-to-site IPsec VPN traffic. Following the CompTIA troubleshooting methodology, the administrator is now preparing to transition to the phase of establishing a plan of action and implementing the solution. Which of the following specific tasks should be performed during this phase? (Select TWO.)
- Assess potential side effects and impacts on downstream network services before applying configuration modifications.Cevap
- Draft a step-by-step implementation procedure alongside a roll-back contingency plan in case issues arise during execution.Cevap
- CExecute ICMP ping sweeps with maximum-payload packets across the tunnel to confirm that packet fragmentation is resolved.
- DLog the root cause analysis, interface configuration changes, and final resolution details in the central ticketing platform.
Cevap
The technician must assess potential side effects on downstream network services and draft a detailed step-by-step implementation plan with rollback contingency steps.
According to the CompTIA troubleshooting methodology, after a theory is confirmed in Step 3, the technician proceeds to Step 4: 'Establish a plan of action to resolve the problem and implement the solution.' This step explicitly requires identifying potential effects on existing systems, designing a clear step-by-step implementation procedure, and formulating a rollback contingency plan.
Adım Adım Çözüm
Anahtar Kavram
CompTIA Troubleshooting Methodology - Plan of Action & Implementation