An organization is conducting a Business Impact Analysis (BIA) and needs to define the maximum acceptable amount of time that a mission-critical system can remain offline following an outage. Which of the following business continuity metrics represents this duration?

  1. Recovery Time Objective (RTO)Cevap
  2. B
    Recovery Point Objective (RPO)
  3. C
    Mean Time Between Failures (MTBF)
  4. D
    Annualized Rate of Occurrence (ARO)

Cevap

Recovery Time Objective (RTO)
The Recovery Time Objective (RTO) represents the maximum targeted duration of time system operations can be down after a disaster before causing critical disruption to business operations.

Adım Adım Çözüm

1
Identify the key requirement in the scenario.
The scenario asks for the metric that defines maximum acceptable system downtime duration following an outage.
Understanding the metric's core focus is necessary to select the correct BIA metric.
2
Differentiate between time-based operational continuity metrics.
Recovery Time Objective (RTO) directly measures allowable restoration time, whereas Recovery Point Objective (RPO) measures allowable data loss.
RTO focuses strictly on system availability and recovery duration.

Anahtar Kavram

Recovery Time Objective (RTO) vs Recovery Point Objective (RPO)