Soru

Zorluk: KolayDeveloping Procedures for Business Continuity and Disaster Recovery Validation

An enterprise organization is preparing a quarterly disaster recovery (DR) simulation to test the failover of a critical web application from its primary GCP region to a secondary region. During previous tests, spinning up secondary compute instances failed because the target region lacked sufficient resource capacity allocations. Which procedure should the Cloud Architect incorporate into the disaster recovery validation workflow to ensure the failover drill succeeds?

  1. Submit and verify regional quota increase requests for required compute resources in the secondary region prior to initiating the failover drill.Cevap
  2. B
    Wait to submit quota increase requests until the failover drill starts to ensure resources are not allocated during baseline operations.
  3. C
    Switch the database disaster recovery architecture from asynchronous replication to a cold-standby backup restore procedure to bypass compute quotas.
  4. D
    Replace the high-bandwidth Dedicated Interconnect with Cloud VPN tunnels immediately before failover testing to bypass regional compute limits.

Cevap

Submit and verify regional quota increase requests for required compute resources in the secondary region prior to initiating the failover drill.
Submitting and verifying regional quota increases before starting a disaster recovery drill ensures that Google Cloud allocates sufficient quota limits for secondary compute resources, allowing automated failover scripts to complete without quota errors.

Adım Adım Çözüm

1
Identify the root cause of the previous DR simulation failure.
Determine that instance provisioning failed due to hitting regional Compute Engine resource quota limits in the failover region.
GCP projects enforce regional quotas on CPU, memory, and IP addresses to prevent unintended resource exhaustion.
2
Define the pre-validation procedure for business continuity testing.
Audit required target capacity and submit regional quota increase requests in advance of the test.
Verifying quota headroom prior to execution guarantees that infrastructure automation can provision failover instances successfully during the DR exercise.

Anahtar Kavram

Disaster recovery validation procedures must include pre-drill verification of target region resource quotas to guarantee successful failover capacity.
Bu soruyu puanla