An enterprise IoT fleet management service runs its telemetry ingestion endpoint on Google Cloud Run. The Site Reliability Engineering (SRE) team has set a Service Level Objective (SLO) of availability over a rolling 30-day window (assuming 1 day = 24 hours). During the current 30-day period, an outage caused total service unavailability for 12 minutes, and a performance regression caused an error budget consumption equivalent to another 4 minutes of downtime. What is the remaining allowable downtime in minutes for this service within the 30-day window?
Cevap: 5.6 minutes
Cevap
The remaining allowable downtime is 5.6 minutes.
For a 30-day window, total minutes equal minutes. With an SLO of , the allowable downtime percentage is , giving a maximum allowable downtime of minutes. Since minutes () of error budget have already been consumed, the remaining allowable downtime is minutes.
Adım Adım Çözüm
Anahtar Kavram
Error Budget Calculation for Availability SLOs
Tahmini Süre:1m 30s