A healthcare telemetry platform hosted on Google Cloud Run and Cloud Bigtable processes real-time patient metrics. The Site Reliability Engineering (SRE) team defines an availability Service Level Objective (SLO) of measured over a rolling 30-day window ( minutes). During an unexpected deployment failure, the service suffered complete downtime for minutes. Later in the same rolling window, a database connection pool exhaustion caused a partial degradation for minutes, during which of all incoming telemetry requests failed. Assuming a constant request rate throughout the window, how many minutes of error budget remain for this 30-day period?
Cevap: 1.2 minutes
Cevap
The remaining error budget for the rolling 30-day window is minutes.
For a 30-day window ( minutes) with a SLO target, the total allowable error budget is minutes. The complete outage consumed minutes. The partial degradation consumed minutes of equivalent downtime budget. Total consumed error budget is minutes. Therefore, the remaining error budget is minutes.
Adım Adım Çözüm
Anahtar Kavram
Error Budget Calculation for Service Level Objectives
Tahmini Süre:2m 0s