Zorluk: OrtaWork Rate and Combined Work

A software engineering team uses three automated refactoring scripts—Script A, Script B, and Script C—to update a large codebase. Working alone at their respective constant rates, Script A can finish the entire codebase in 1010 hours, Script B in 1515 hours, and Script C in 3030 hours. All three scripts begin running simultaneously. After 22 hours, Script A encounters an error and stops running. Script B and Script C continue running together without interruption until the codebase is completely refactored. How many additional hours will it take for Script B and Script C to complete the remaining work?

Cevap: 6 hours

Cevap

6 hours
The rate of Script A is 110\frac{1}{10} of the codebase per hour, Script B is 115\frac{1}{15} per hour, and Script C is 130\frac{1}{30} per hour. Working together for 22 hours, all three scripts complete 2×(110+115+130)=2×15=252 \times \left(\frac{1}{10} + \frac{1}{15} + \frac{1}{30}\right) = 2 \times \frac{1}{5} = \frac{2}{5} of the codebase, leaving 125=351 - \frac{2}{5} = \frac{3}{5} of the task remaining. With Script A offline, the combined rate of Script B and Script C is 115+130=110\frac{1}{15} + \frac{1}{30} = \frac{1}{10} per hour. The additional time required to complete the remaining work is 3/51/10=6\frac{3/5}{1/10} = 6 hours.

Adım Adım Çözüm

1
Determine the individual work rates of Script A, Script B, and Script C.
Rate of Script A = 110\frac{1}{10} codebase/hour, Rate of Script B = 115\frac{1}{15} codebase/hour, Rate of Script C = 130\frac{1}{30} codebase/hour.
Work rate is the reciprocal of the total time required to complete one entire job working alone.
2
Calculate the combined work rate of all three scripts during the initial 2-hour period.
Combined Rate(A+B+C) = 110+115+130=3+2+130=630=15\frac{1}{10} + \frac{1}{15} + \frac{1}{30} = \frac{3 + 2 + 1}{30} = \frac{6}{30} = \frac{1}{5} codebase/hour.
When multiple agents work together simultaneously, their individual work rates are added.
3
Determine the fraction of the codebase refactored during the first 2 hours.
Work Completed = 2 hours×15 codebase/hour=252 \text{ hours} \times \frac{1}{5} \text{ codebase/hour} = \frac{2}{5} of the total codebase.
Total work done equals rate multiplied by time.
4
Calculate the remaining fraction of the codebase left to be processed.
Remaining Work = 125=351 - \frac{2}{5} = \frac{3}{5} of the total codebase.
Subtracting the completed fraction from 1 gives the uncompleted portion of the job.
5
Calculate the combined rate of Script B and Script C after Script A stops.
Rate(B+C) = 115+130=2+130=330=110\frac{1}{15} + \frac{1}{30} = \frac{2 + 1}{30} = \frac{3}{30} = \frac{1}{10} codebase/hour.
Only Script B and Script C contribute to the remaining work.
6
Calculate the additional time required for Script B and Script C to finish the remaining work.
Additional Time = 3/51/10=35×10=6\frac{3/5}{1/10} = \frac{3}{5} \times 10 = 6 hours.
Time equals remaining work divided by the active combined rate.