A manufacturing plant operates two automated production lines, Assembly Line X and Assembly Line Y. Assembly Line Y operates at a standard rate that is faster than the standard rate of Assembly Line X. During a specific shift, Assembly Line X operated for hours at its standard rate, after which its processing rate decreased by for an additional hours due to maintenance. Assembly Line Y began operating hour after Line X started; it operated at its standard rate for hours, and then operated for another hours at of its standard rate. If the two lines produced a combined total of units during this shift, what was the standard operating rate of Assembly Line X, in units per hour?
Cevap: 220 units per hour
Cevap
The standard operating rate of Assembly Line X is 220 units per hour.
Assembly Line X produces units in its first 4 hours and units in its final 2 hours, totaling units. Assembly Line Y produces units in its first 4 hours and units in its final 2 hours, totaling units. The sum of their outputs is . Dividing by gives .
Adım Adım Çözüm
Anahtar Kavram
Algebraic Modeling of Staggered Work and Variable Production Rates
Tahmini Süre:2m 30s