A nurse is preparing to administer an intravenous (IV) antibiotic piggyback to a client receiving a compatible continuous primary infusion of 0.9% sodium chloride. Place the following steps for setting up the secondary infusion in the correct chronological order.
- 1Close the roller clamp on the secondary IV tubing.
- 2Spike the secondary medication bag and prime the tubing.
- 3Scrub the uppermost access port of the primary tubing with an antiseptic swab.
- 4Connect the primed secondary IV tubing to the cleansed primary line port.
- 5Hang the primary IV fluid bag lower than the secondary medication bag.
Cevap
The correct chronological sequence is to close the secondary roller clamp, spike and prime the secondary line, cleanse the primary access port, connect the lines, and hang the primary bag lower than the secondary bag.
Following the proper chronological sequence for an IV piggyback setup ensures patient safety by preventing fluid loss, avoiding air embolisms, maintaining strict asepsis, and utilizing gravity correctly for the secondary infusion.
Adım Adım Çözüm
Anahtar Kavram
Intravenous Piggyback (IVPB) Setup Sequence