During a severe heatwave, the District Headquarters Hospital experiences a sudden grid power failure, and the automated backup generator fails to engage. As the Chief Medical Officer (CMO) serving as the health facility crisis manager, which of the following immediate administrative actions align with standard emergency management protocols? (Select all that apply)
- Initiate the standard manual generator override procedure and immediately inform the District Disaster Management Authority (DDMA) to request priority technical support.Cevap
- Prioritize ICU patients on battery-backed essential life support and coordinate temporary diversion of non-critical emergency arrivals to nearby secondary healthcare centers.Cevap
- COrder uncertified local electrical workers to bypass statutory electrical safety regulations and perform unauthorized modifications on the energized high-voltage line.
- DImmediately evacuate all critical care patients into unconditioned outdoor open spaces without portable life-support devices.
Cevap
The actions involving manual generator protocol activation with official disaster management notification, along with patient triage and diversion coordination, are correct.
The correct responses advocate for following established operational contingency plans: manually engaging generator backups, notifying the competent disaster authority, prioritizing critical care units, and managing hospital intake through structured diversion.
Adım Adım Çözüm
Anahtar Kavram
Standard Emergency Operations and Inter-Agency Protocol Compliance