While driving on a motorway, you approach a roadworks section where temporary signs display the number 40 inside a red circle on a yellow backing board. What does this speed limit indicate?
- AIt is an advisory speed recommendation that applies only when workers are visible on the carriageway
- It is a legally enforceable maximum speed limit that must not be exceeded at any timeCevap
- CIt is a minimum speed requirement designed to keep traffic moving steadily through the narrow lanes
- DIt is a restriction that applies solely to heavy goods vehicles and vehicles towing trailers
Cevap
It is a legally enforceable maximum speed limit that must not be exceeded at any time
In the UK Highway Code, signs with a red circle give mandatory orders. A speed limit displayed inside a red circle—even when placed temporarily on a yellow backing board through motorway roadworks—is legally enforceable at all times, 24 hours a day, regardless of whether workers are actively present.
Adım Adım Çözüm
Anahtar Kavram
Mandatory temporary speed limits at motorway roadworks
Tahmini Süre:1m 0s