An internal medicine team is caring for a 69-year-old female admitted for acute pyelonephritis. On her second day of hospitalization, she experiences a drop in blood pressure to along with tachycardia of . The electronic health record (EHR) generates a "sepsis warning" pop-up. The on-call resident rapidly closes the pop-up without reviewing it because this particular warning has appeared over thirty times during their shift for clinically stable patients. Consequently, intravenous fluid resuscitation and broad-spectrum antibiotics are delayed by four hours. The patient requires a transfer to the intensive care unit for vasopressor support but ultimately recovers. The hospital's patient safety officer is tasked with addressing this incident. Which of the following proposed solutions represents the most effective quality improvement strategy to prevent a similar event?
- Refining the EHR algorithm to require both vital sign abnormalities and acute laboratory changes before triggeringCevap
- BIssuing a documented disciplinary warning to the on-call resident for ignoring a critical electronic notification
- CInstituting an annual, mandatory hospital-wide training session regarding the timely recognition and management of sepsis
- DConfiguring the EHR to require the entry of a fifty-character minimum justification before the pop-up can be closed
- EPermanently disabling the sepsis notification software to decrease cognitive overload and depend exclusively on physician bedside assessment