Question

Difficulty: EasyInverse Proportions

A detail of 1818 recruits can sweep and mop a large warehouse in 2020 minutes. If the schedule allows 1.51.5 hours for the task, how many recruits, working at the same constant rate, are required?

  1. A
    240240
  2. B
    2424
  3. 44Answer
  4. D
    8181

Answer

The correct answer is 44.
The scenario describes an inverse proportion because giving the detail more time to complete the task means fewer recruits are needed. By converting 1.51.5 hours to 9090 minutes and applying the inverse proportion relationship (18×20=x×9018 \times 20 = x \times 90), we find that exactly 44 recruits are required.

Step-by-Step Solution

1
Calculate the total workload required to complete the task.
W1×T1=18×20=360W_1 \times T_1 = 18 \times 20 = 360 recruit-minutes.
In inverse proportion problems involving work, the product of the number of workers and their time represents a constant total amount of work.
2
Convert the new target time into the same unit (minutes).
1.5 hours=1.5×60=90 minutes1.5 \text{ hours} = 1.5 \times 60 = 90 \text{ minutes}.
Units must be consistent across the equation to yield a valid result.
3
Divide the total workload by the new target time to find the required number of recruits.
360÷90=4360 \div 90 = 4 recruits.
Applying the inverse proportion formula W2=Total Work÷T2W_2 = \text{Total Work} \div T_2 reveals how many workers are needed for the longer duration.

Key Concept

Inverse Proportions

Alternative Method

You can also solve this by finding the total work in 'recruit-hours'. First, convert 2020 minutes to 1/31/3 of an hour. The total work is 18 recruits×(1/3) hour=6 recruit-hours18 \text{ recruits} \times (1/3) \text{ hour} = 6 \text{ recruit-hours}. Since the new time is 1.51.5 hours, the required number of recruits is 6÷1.5=46 \div 1.5 = 4 recruits.
Estimated Time:1m 0s