A military engineering unit is laying communication cable between two outposts. The total required distance for the connection is . The supply depot issues this specific cable in standard spools containing of cable each. If is approximately equal to , what is the minimum number of spools the unit must request to ensure they have enough cable to cover the entire distance?
- A6
- B9
- 15Answer
- D144
Answer
15
To find the total number of spools needed, first unify the units of measurement. Convert 4.5 miles into kilometers by multiplying by 1.6, yielding 7.2 kilometers. Since the spools are measured in meters, convert 7.2 kilometers into meters by multiplying by 1,000, which equals 7,200 meters. Next, divide the 7,200-meter total distance by the 500 meters contained on each spool, resulting in 14.4 spools. Because a fraction of a spool cannot be requested and the full distance must be covered, the number must be rounded up to the nearest whole spool, making 15 the correct amount to request.
Step-by-Step Solution
Key Concept
Converting across measurement systems (US Customary to Metric) and solving practical constraints using the ceiling function.