A network engineer is troubleshooting performance degradation on an enterprise Storage Area Network (SAN) uplink. After analyzing link metrics and performing diagnostic tests, the engineer successfully confirms their hypothesis that excessive frame errors are caused by an over-subscribed switch interface. Which of the following is the NEXT step the engineer should take according to the CompTIA troubleshooting methodology?
- Establish a plan of action to resolve the problem and identify potential effects.Answer
- BVerify full system functionality and implement preventive measures on the switch.
- CDocument the diagnostic findings, test results, and final outcomes in the tracking system.
- DGather additional information from affected users to determine if recent changes occurred.
Answer
Establish a plan of action to resolve the problem and identify potential effects.
According to the CompTIA troubleshooting methodology, once a theory of probable cause is tested and confirmed, the network professional must establish a plan of action to resolve the problem while identifying potential side effects before implementing changes.
Step-by-Step Solution
Key Concept
CompTIA Troubleshooting Methodology Sequence