Question

Difficulty: EasyPatch and Configuration Management

A system administrator is preparing to roll out a critical operating system patch across enterprise workstations. Which of the following tasks should be completed prior to deploying the patch into the broad production environment? (Select TWO.)

  1. Test the patch in an isolated staging environment to verify system stability and application compatibility.Answer
  2. Establish a rollback plan and back up system configurations to ensure rapid recovery if the update fails.Answer
  3. C
    Reconfigure network access control lists to reclassify the operating system update as a detective security control.
  4. D
    Deploy perimeter firewall filters as a permanent substitute for patching software host vulnerabilities.

Answer

Testing the patch in an isolated staging environment to verify system stability and establishing a rollback plan with backups prior to deployment.
Prior to deploying software updates across production environments, best practices require validating patch stability in a non-production staging environment and creating backups with a documented rollback plan to recover quickly if issues arise.

Step-by-Step Solution

1
Identify pre-deployment requirements in the patch management lifecycle.
Recognize that changes must be tested in a controlled staging environment before production release.
Testing mitigates the risk of unforeseen software incompatibilities or system crashes.
2
Determine risk mitigation procedures for patch deployment failures.
Establish backups and a clear rollback plan.
System snapshots and backups enable quick restoration if a patch introduces severe operational disruptions.

Key Concept

Pre-deployment Patch Staging and Rollback Planning
Rate this question