An IT systems administrator is preparing a formal change request to apply a critical operating system patch to a pool of virtual desktop infrastructure (VDI) hosts that support the financial reporting team. Which of the following components must be documented and included in the change request prior to submitting it to the Change Advisory Board (CAB) for approval? (Select TWO).
- A comprehensive rollback plan detailing specific procedure steps to restore previous desktop templates if issues ariseCevap
- A risk analysis evaluating potential business disruption and impact associated with the changeCevap
- CPost-implementation testing logs generated from performing the patch installation on live production desktops
- DA permanent executive authorization waiver that eliminates the need for future patch documentation
Cevap
The change request submitted to the CAB must include a comprehensive rollback plan and a risk analysis evaluating potential business impact.
A formal change request submitted for Change Advisory Board (CAB) review must include a clear risk assessment detailing business impact and a documented rollback plan specifying recovery procedures if the change fails. Both elements allow stakeholders to weigh benefits against potential downtime and ensure business continuity.
Adım Adım Çözüm
Anahtar Kavram
Formal Change Management Request Elements