A municipal public safety agency completes a Business Impact Analysis (BIA) for its automated emergency computer-aided dispatch system. The analysis determines that the agency can tolerate a maximum data loss of 5 minutes of call records during an unexpected database disruption. Additionally, the overall emergency dispatch service must be restored and operational within 4 hours to prevent severe operational breakdown. Which of the following choices correctly categorizes these two business continuity thresholds?
- Recovery Point Objective (RPO) of 5 minutes and Recovery Time Objective (RTO) of 4 hoursCevap
- BRecovery Time Objective (RTO) of 5 minutes and Recovery Point Objective (RPO) of 4 hours
- CMean Time Between Failures (MTBF) of 5 minutes and Maximum Tolerable Downtime (MTD) of 4 hours
- DRecovery Point Objective (RPO) of 5 minutes and Mean Time to Repair (MTTR) of 4 hours
Cevap
The emergency dispatch system requires a Recovery Point Objective (RPO) of 5 minutes and a Recovery Time Objective (RTO) of 4 hours.
The correct response accurately pairs the 5-minute data loss threshold with the Recovery Point Objective (RPO) and the 4-hour system restoration timeline with the Recovery Time Objective (RTO). RPO focuses on data integrity and transactional loss limits, whereas RTO focuses on service availability and downtime limits.
Adım Adım Çözüm
Anahtar Kavram
Distinction between Recovery Point Objective (RPO) and Recovery Time Objective (RTO)