An enterprise retail logistics company recently completed a Business Impact Analysis (BIA) for its centralized inventory management platform. The assessment established a Recovery Point Objective (RPO) of minutes, a Recovery Time Objective (RTO) of hours, and a Maximum Tolerable Downtime (MTD) of hours. Which of the following technical strategies directly support these established metrics? (Select TWO.)
- Configuring transaction log shipping and automated database replication at intervals not exceeding minutes.Cevap
- Provisioning a warm recovery site equipped to restore production database operations within hours of a disaster declaration.Cevap
- CImplementing high-availability automated failover to guarantee system availability stays within a -minute Maximum Tolerable Downtime.
- DScheduling full system backups once every hours to satisfy the Recovery Point Objective.
Cevap
The correct strategies are: configuring transaction log shipping and database replication at intervals under 30 minutes, and provisioning a warm recovery site capable of restoring operations within 4 hours.
The option specifying replication intervals of 30 minutes or less directly ensures that data loss remains within the 30-minute RPO threshold. Furthermore, the option designating a warm site capable of restoring operations within 4 hours satisfies the specified 4-hour RTO and ensures the business remains well under its 12-hour MTD boundary.
Adım Adım Çözüm
Anahtar Kavram
BIA metrics alignment (RPO, RTO, and MTD)