Soru

Zorluk: OrtaDeveloping Procedures for Business Continuity and Disaster Recovery Validation

An online media streaming platform hosts its user entitlement system on Google Cloud across a primary region (us-central1) and a secondary failover region (us-east4). The cloud architecture team is updating their quarterly Disaster Recovery (DR) and Business Continuity Plan (BCP) validation procedures to ensure regional failover readiness without causing production disruptions. Which procedures should be included in the DR validation workflow to accurately validate failover preparedness and maintain compliance with recovery objectives? (Select TWO options.)

  1. Pre-verify regional Compute Engine resource quotas and request necessary quota increases in the target failover region prior to executing the failover drill.Cevap
  2. Perform automated data integrity verification and sequence checks on database replicas immediately after redirecting traffic to validate Recovery Point Objective (RPO) compliance.Cevap
  3. C
    Transition the multi-region database architecture to rely on asynchronous nightly exports to Cloud Storage during DR validation to test backup-and-restore failover speed.
  4. D
    Reroute failover validation traffic over a temporary single HA VPN tunnel instead of existing Dedicated Interconnect links to simulate emergency network bandwidth throttling.

Cevap

The correct procedures are pre-verifying regional resource quotas in the target failover region prior to the drill and performing automated data integrity checks on database replicas immediately after rerouting traffic.
Comprehensive DR validation requires verifying infrastructure provisioning capacity beforehand and validating data consistency after traffic shift. Requesting regional Compute Engine quota increases prior to the drill ensures that target regions can accommodate incoming workloads. Performing automated data integrity checks right after shifting traffic verifies that database replication met RPO objectives without data loss.

Adım Adım Çözüm

1
Assess infrastructure capacity prerequisites in the secondary failover region.
Identified potential compute and storage quota bounds in us-east4.
Requesting quota increases in advance ensures compute instance groups can scale out fully during failover testing.
2
Establish automated data integrity verification procedures following traffic redirection.
Automated validation scripts verify record checksums and sequence IDs across database tables.
Validates that the secondary region's data state matches the primary region at failover time, proving compliance with RPO requirements.

Anahtar Kavram

Disaster Recovery Validation and Capacity Preparedness
Bu soruyu puanla