Three automated production lines—Line A, Line B, and Line C—run continuous maintenance cycles every minutes, minutes, and minutes, respectively. All three lines completed a maintenance cycle simultaneously at 8:00 a.m. on Monday. A supervisory inspection is triggered whenever at least two of the three lines complete a maintenance cycle at the exact same time. Between 8:01 a.m. on Monday and 8:00 a.m. on Tuesday, inclusive, how many supervisory inspections will be triggered?
Cevap: 16
Cevap
16
To find the number of times at least two lines finish maintenance simultaneously, we determine the LCM for each pair of intervals (180, 225, and 300 minutes) and calculate how many multiples of these values occur within 1,440 minutes. Within this duration, there are 8 multiples of 180, 6 multiples of 225, and 4 multiples of 300. The single time all three coincide (at 900 minutes) is included in all three pairwise counts. Subtracting 2 instances of this overlap yields 8 + 6 + 4 - 2 = 16 total supervisory inspections.
Adım Adım Çözüm
Anahtar Kavram
Least Common Multiple (LCM) and Inclusion-Exclusion Principle