Read the passage below carefully:
Commissioned in 1968, the Kainji Hydroelectric Power Station was constructed along the Niger River in Niger State to serve as Nigeria's primary source of grid electricity. Although initial feasibility studies conducted by the British Balfour Beatty firm recommended a six-turbine installation producing 480 megawatts, financial constraints during the first phase of development limited the actual installation to four turbines generating 320 megawatts. Operation of the station fell under the jurisdiction of the Electricity Corporation of Nigeria until 1972, when the entity merged with the Niger Dams Authority to form the National Electric Power Authority. Crucially, the reservoir created by the dam displaced over 44,000 residents, necessitating the largest planned resettlement scheme in West African history prior to the Volta River Project in Ghana.
Evaluate the following statement based strictly on the passage above:
The Kainji Hydroelectric Power Station commenced operations with six turbines generating an initial capacity of 480 megawatts as recommended by feasibility studies.
Cevap: Cevap